In this case you ll need to maintain the starter strip height on both sides of the deck and trim the siding to fit above the deck.
Garage siding starter course.
Nail the starter strip in place above the drip cap with a coiled nailing sider.
Starter strip is used at the bottom of each side of the home to lock the first course of siding in place.
This video shows how to install a starter strip for vinyl and polymer siding installation.
Cut vinyl pieces to fit with a saw or snips.
Hardieplank lap siding requires a starter strip beneath the first course.
Start with a level chalk line for the bottom starter strip and check the level periodically as you go up.
In order for the siding to be installed properly in a level fashion the starter strip at the bottom of the wall must be level.
Determine the lowest point of the wall that will be sided.
Hold a second piece of siding against the j channel at the slope of the gable.
It doesn t need to fit exactly in the corner.
You can make your own fiber cement starter strip by ripping a piece of hardieplank lap siding into 1 1 4 inch strips.
For vinyl use special trim strips which should come with the.
Step 6 finish your garage siding with trim.
Use the wider starter strip the bottom of the starter strip the part the bottom panel hooks on to should be at least 1 in.
You have two options here you can make your own or you may be able to find acceptable prefabricated third party starter strips available for purchase.
This should be nailed every 6 inches with it s lower edge running along the chalk line.
From that point measure up 1 4 6 4mm less than the width of the starter strip and partially drive a nail at one corner.
Mark the slope with a pencil on the short piece of siding.
Remove the short piece and cut along the pencil line as a pattern for the gable angle cuts.
Staret strip secures the first course of siding to the home.
As shown in the diagram a wooden spacer can be used to provide the proper angle for the first strip.
Most manufacturers produce a starter strip that secures the bottom course of siding to the sheathing and holds it at the proper angle.
Below the top of the foundation but the lower the vinyl siding is installed the better.
Lock a short piece of siding into the gable starter course i e the last course before the gable starts.
It protects the sheathing from rain snow and pests.
Learn how to remove an old garage door and install a new one with these detailed step by step instructions.
Begin by installing the first row of siding on both sides of the.